The builders are invading “our” half of the house again. This time the bottom floor is OK but they are replacing both the window and the door in our bedroom, as well as doing some electrical work up there. Installing doors and windows is dusty, dirty work, since it means cutting and screwing into drywall, so we’ve removed all bedding, clothes etc from the bedroom, and crammed it into Ingrid’s already-cramped bedroom. Tonight I will be sleeping on a mattress on the floor in Ingrid’s room, and Adrian will be on a cot mattress that we just barely managed to squeeze in beside mine. Total remaining free floor area: about enough to put both feet down, between the door and my mattress. It remains to be seen whether anyone in that room will actually get any sleep. Eric, who will be sleeping on the living room floor, gets the best deal.